Govenza, Your Track Partner
A designer working on a jersey design on a computer in the factory's design office

Step 01

Design

We draw your kit in vector artwork on the actual pattern pieces of the garment, so the crest, stripes and sponsor areas sit exactly where you want them on every size.

Send your crest as AI, EPS, PDF or a good PNG. If you only have a low-resolution logo, we redraw it free.

A printed kit mock-up sheet with front, back and side views on the designer's desk

Step 02

Mock-up

You get a mock-up of the front, back and side, with your names and numbers, and a roster sheet that lists every player's name, number and size.

Change anything you like. We revise until you approve it, usually within 24 to 48 hours per round.

A sample jersey with a SAMPLE tag hanging in the factory's sample room

Step 03

Sample

A sample lets you check the fabric, the fit and the exact colours before bulk production. It takes about 7 to 10 days plus courier time.

The quickest way to approve it: we film your finished sample and send the video on WhatsApp, close up on the stitching, the fabric and the sublimated colours. You can approve it the same day, without waiting for a courier. If you prefer to hold it in your hands, we send it by courier.

Sublimation paper printed with jersey panels coming out of the printer

Step 04

Print

Each panel of every size is laid out on the printer as a mirror image and printed onto transfer paper with sublimation inks.

Our printers run colour-managed profiles, and we compare the result with your Pantone references before production starts.

Printed fabric coming out of the heated drum of the calender

Step 05

Press

The printed paper and the white polyester fabric pass together through heat on a rotary calender at around 200°C.

The ink turns to a gas and bonds with the polyester fibres. That is why a sublimated print cannot crack, peel or wash out, and why the fabric stays breathable.

Printed jersey panels cut out and tied in bundles on the cutting table

Step 06

Cut

Our cutting machine uses a camera to read the printed outline of each panel and a laser follows it exactly, sealing the edge as it cuts so it does not fray.

Because the cut follows the print, stripes and graphics meet perfectly at the seams.

A machine operator stitching a jersey seam on the factory's sewing floor

Step 07

Stitch

Flatlock seams join the panels flat, so there is no ridge to rub against the skin. Hems are finished with stretch stitching (coverstitch) so they move with the body.

Collars, underarms and other stress points get extra stitching. Your neck label or size label is sewn in at this stage.

A team order of numbered red jerseys packed in a carton, ready to ship

Step 08

Check and ship

Every piece is checked for print, colour and seams, and measured against the size chart. Before shipping we send you photos of the finished order.

Kits are folded and bagged by player, sorted by number, and packed in cartons with a packing list.

Decoration options

We choose the method with you, based on the garment and the look you want.

MethodWhat it isBest for
SublimationFull designs, gradients, sponsors, names and numbers printed into the fabric.All polyester kits, training wear, socks and accessories
EmbroideryStitched crests and logos with a premium, raised finish.Polos, jackets, hoodies, tracksuits and caps
Tackle twillCut and stitched fabric numbers and letters, the classic American look.American football, basketball and baseball-style jerseys
Screen printBold one or two-colour prints on cotton and blends.T-shirts and hoodies

Fabrics

Sublimated kits are made from performance polyester, because sublimation ink bonds only with polyester. We use different knits for different sports: light mesh and interlock for football and volleyball, heavier knits for rugby, and recycled polyester on request.

We can send you a swatch card of our fabrics with your sample.

Football, volleyball
Light mesh or interlock, about 130–160 g/m²
Basketball
Breathable mesh, about 140–170 g/m²
Rugby
Heavier knit, about 200–260 g/m²
Training, tracksuits
Stretch knits and soft-shell, by product

Capacity and lead times

Mock-up
24–48 h
Sample
7–10 days
Bulk production
3–4 weeks
Express to Europe
3–5 days

How we check quality

Want to see it for yourself? Ask for a sample, or a video call from the factory floor.